• Türkçe
    • English
  • English 
    • Türkçe
    • English
  • Login
View Item 
  •   DSpace Home
  • Mühendislik Fakültesi
  • Endüstri Mühendisliği Bölümü
  • Endüstri Mühendisliği Bölümü Tez Koleksiyonu
  • View Item
  •   DSpace Home
  • Mühendislik Fakültesi
  • Endüstri Mühendisliği Bölümü
  • Endüstri Mühendisliği Bölümü Tez Koleksiyonu
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Prioritization Of Public Investment Project Proposals Using Fuzzy Analytic Hierarchy Process

View/Open
Yüksek Lisans Tezi (4.303Mb)
Date
2019-06-27
Author
Karaçolak , Mehmet Baha
xmlui.mirage2.itemSummaryView.MetaData
Show full item record
Abstract
Investments made by the governments in order to increase the economic, social and welfare levels of the society are called public investments. Services such as transportation, energy, communication, production, health, education, and justice, as well as various supporting activities such as construction, renovation, maintenance and repairs, and various equipment supplied to ensure the continuity of these services are examples of public investments. All countries, especially developing countries such as Turkey have to make the right investment decisions in order to ensure effective use of their limited resources. Therefore, all projects to be realized should be analyzed through methods and models, which can quantify and prioritize those projects. However, in the current situation, a scientific method based on quantification in the decision-making process on the selection of investment projects has not been adopted yet in Turkey. In this context, the purpose of this thesis is to improve the quality of the selection process through a new model able to assess project proposals regardless of country, sector, and type. The model proposed in the thesis consists of two main stages. In the first stage, a set of criteria has been developed to be used in the evaluation of proposals and fuzzy AHP analysis was conducted to weight these criteria. In the second stage, a method has been developed in which the decision maker evaluates the proposal in terms of fulfilling the criteria, assigns 1 or 0 points to each criterion and thus calculates a priority score for this project proposal. Project proposals have been prioritized by using the priority scores calculated for each project proposal.
URI
http://hdl.handle.net/11655/9367
xmlui.mirage2.itemSummaryView.Collections
  • Endüstri Mühendisliği Bölümü Tez Koleksiyonu [39]
Hacettepe Üniversitesi Kütüphaneleri
Açık Erişim Birimi
Beytepe Kütüphanesi | Tel: (90 - 312) 297 6585-117 || Sağlık Bilimleri Kütüphanesi | Tel: (90 - 312) 305 1067
Bizi Takip Edebilirsiniz: Facebook | Twitter | Youtube | Instagram
Web sayfası:www.library.hacettepe.edu.tr | E-posta:openaccess@hacettepe.edu.tr
Sayfanın çıktısını almak için lütfen tıklayınız.
Contact Us | Send Feedback



DSpace software copyright © 2002-2016  DuraSpace
Theme by 
Atmire NV
 

 


DSpace@Hacettepe
huk openaire onayı
by OpenAIRE

About HUAES
Open Access PolicyGuidesSubcriptionsContact

livechat

sherpa/romeo

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsTypeDepartmentPublisherLanguageRightsIndexing SourceFundingxmlui.ArtifactBrowser.Navigation.browse_subtypeThis CollectionBy Issue DateAuthorsTitlesSubjectsTypeDepartmentPublisherLanguageRightsIndexing SourceFundingxmlui.ArtifactBrowser.Navigation.browse_subtype

My Account

LoginRegister

Statistics

View Usage Statistics

DSpace software copyright © 2002-2016  DuraSpace
Theme by 
Atmire NV